Ordering the right volume
There is no set minimum or maximum order quantity. Small loads from around 0.2m³ can be supplied on minimum rates, while large continuous pours can also be scheduled.
Most general orders can be fitted into the schedule within a day or two. Larger pours need more planning, with around four weeks' notice recommended for projects requiring 100m³ to 200m³ or more.
Under-ordering is one of the most common causes of delays during a pour, so Beulah's concrete calculators can help estimate the volume required for slabs, pads and post holes before you place your order.
Concrete strength, quantity, aggregate and colour requirements can then be confirmed with the team before batching.